Publications personnelle

118documents trouvés

08827
01/12/2008

Scheduling groups of operations: a multicriteria approach to provide sequential flexibility

C.ESSWEIN, J.C.BILLAUT, C.ARTIGUES

LI, MOGISA

Ouvrage (contribution) : Flexibility and Robustness in Scheduling (Control Systems, Robotics and Manufacturing) by Jean-Charles Billaut, Aziz Moukrim, and Eric Sanlaville, ISTE-WILEY, 352p., N°ISBN 978-1-84821-054-7, Décembre 2008, Chapitre 10, pp.227-248 , N° 08827

Non diffusable

117820
08828
01/12/2008

Resource allocation for the construction of robust project schedules

C.ARTIGUES, R.LEUS, W.HERROELEN

MOGISA, KU Leuven

Ouvrage (contribution) : Flexibility and Robustness in Scheduling (Control Systems, Robotics and Manufacturing) by Jean-Charles Billaut, Aziz Moukrim, and Eric Sanlaville, Décembre 2008, pp.171-197 , N° 08828

Non diffusable

117822
08802
01/07/2008

Modèles mathématiques et algorithmes d'allocation de fréquences de type SDMA appliqué à un système de télécommunications par satellite

L.HOUSSIN, C.ARTIGUES

MOGISA

Rapport de Contrat : LAAS-CNRS/Thalès Alenia Space. Contrat n° 33986, Juillet 2008, 47p. , N° 08802

Diffusion restreinte

117220
06806
27/05/2008

Models and methods for frequency allocation with cumulative interference constraints

M.PALPANT, C.OLIVA, C.ARTIGUES, P.MICHELON, M.D.BIHA

LIA Avignon, CONCEPCION, MOGISA, Avignon

Revue Scientifique : International Transactions in Operational Research, Vol.15, N°3, pp.307-324, Mai 2008 , N° 06806

Lien : http://hal.archives-ouvertes.fr/hal-00116624

Diffusable

Plus d'informations

Abstract

In this paper, a realistic modeling of interferences for frequency assignment in hertzian telecommunication networks is presented. In contrast with traditional interference models based only on binary interference constraints involving two frequencies, this new approach considers the case of cumulative disruptions that are modeled through a unique non-binary constraint. To deal with these complex constraints, we propose extensions of classical integer linear programming formulations. On a set of realistic instances, we propose hybrid constraint programming and large neighborhood search solution methods to solve minimum interference and minimum span frequency assignment problems. We compare their performances with those of existing heuristics. Finally, we show how the end-user benefits from using the cumulative model instead of the traditional one.

Mots-Clés / Keywords
Frequency allocation; Cumulative interference constraints; Linear programming; Constraint programming; Large neighborhood search;

113893
08257
20/05/2008

Real-time workshop scheduling

C.ARTIGUES, F.ROUBELLAT

MOGISA

Ouvrage (contribution) : Production scheduling, ISTE/Wiley; Eds. P.Lopez, F.Roubellat, N°IISBN 978-1-84821-017-2, Mai 2008, pp.393-425 , N° 08257

Non diffusable

113855
08242
19/05/2008

Heuristics

C.ARTIGUES, D.RIVREAU

MOGISA, IMA, Angers

Ouvrage (contribution) : Resource-constrained project scheduling. Models, algorithms, extensions and applications, ISTE/Wiley, Eds. C.Artigues, S.Demassey, E.Neron, N°ISBN 978-1-84821-034-9, Mai 2008, Chapitre 6, pp.87-105 , N° 08242

Non diffusable

113822
08240
19/05/2008

Resource-constrained project scheduling. Models, algorithms, extensions and applications

C.ARTIGUES, S.DEMASSEY, E.NERON

MOGISA, Ecole Mines, Tours

Ouvrage (éditeur) : ISTE/Wiley, N°ISBN 978-1-84821-034-9, Mai 2008, 320p. , N° 08240

Non diffusable

113818
08244
19/05/2008

Activity insertion problem in a RCPSP with minimum and maximum time lags

C.ARTIGUES, C.BRIAND

MOGISA

Ouvrage (contribution) : Resource-constrained project scheduling. Models, algorithms, extensions and applications, ISTE/Wiley, Eds. C.Artigues, S.Demassey, E.Neron, N°ISBN 978-1-84821-034-9, Mai 2008, Chapitre 11, pp.171-190 , N° 08244

Non diffusable

113826
08241
19/05/2008

The resource-constrained project scheduling problem

C.ARTIGUES

MOGISA

Ouvrage (contribution) : Resource-constrained project scheduling. Models, algorithms, extensions and applications, ISTE/Wiley, Eds. C.Artigues, S.Demassey, E.Neron, N°ISBN 978-1-84821-034-9, Mai 2008, Chapitre 1, pp.21-35 , N° 08241

Non diffusable

113820
08243
19/05/2008

Benchmark instance indicators and computational comparison of methods

C.ARTIGUES, O.KONE, P.LOPEZ, M.MONGEAU, E.NERON, D.RIVREAU

UPS, Tours, MOGISA, IMA, Angers

Ouvrage (contribution) : Resource-constrained project scheduling. Models, algorithms, extensions and applications, ISTE/Wiley, Eds. C.Artigues, S.Demassey, E.Neron, N°ISBN 978-1-84821-034-9, Mai 2008, Chapitre 7, pp.107-135 , N° 08243

Non diffusable

113824
Pour recevoir une copie des documents, contacter doc@laas.fr en mentionnant le n° de rapport LAAS et votre adresse postale. Signalez tout problème de fonctionnement à sysadmin@laas.fr. http://www.laas.fr/pulman/pulman-isens/web/app.php/